Landfill Gas Flare - Tramore
After carrying out an extensive pumping trial with egeplast’s own fully trained and certified staff,
over a period of four months, a decision in conjunction with our principals Unilfare U.K. was taken
to install a Uniflare 250m³ High Temperature Flare complete with a sophisticated telemetry system. The flare
was installed by egeplast’s own staff, commissioned by a Uniflare technician and the flare is now serviced
and maintained by fully trained & certified egeplast service staff.
egeplast also manufactured and commissioned all auxiliary equipment that includes all wellheads, boxed
manifolds, condensate/drip legs, pumped knock out pots and a complete pneumatically controlled fully ATEX
approved pumping system; all pumps supplied are 3” Geopumps from MGS U.K.
Mainly thanks to the fact that egeplast manufactured and controlled all auxiliary supplies, the entire
condensate & leachate removal system never caused any trouble and was passed without problem by the Consulting
Engineers RPS MC O’Sullivan; in charge of the entire project. The installation of the equipment was carried out
by the main contractor Lining Technology from Tramore.
Click here for more information about our Landfill Gas Flares



